Our Equipment
![](https://komatdrilling.com/wp-content/uploads/2018/06/Rig-1-Sky2.jpg)
Rig 1 – Self Mobile & Top Drive
- Hook load – 50,000 lbs
- Range 3 casing (8 5/8-inch casing)
- Depth – 300 meters
- Mud Tanks – 3 tanks, 22m3 total capacity
- Triplex Mud Pump – 1.3m3 per minute
- 55KW light plant
- Boiler – Saskatoon 60HP
- Rig Manager Shack – wheeled trailer w/ crew bathroom
- Loads – Summer 4 & Winter 5
![](https://komatdrilling.com/wp-content/uploads/2018/05/rig2.jpg)
Rig 2 – Self Mobile & Top Drive
- Hook load – 60,000 lbs
- Range 3 casing (8 5/8-inch casing)
- Depth – 350 meters
- Mud Tanks – 3 tanks, 22m3 total capacity
- Triplex Mud Pump – 1.3m3 per minute
- 55KW light plant
- Boiler – Saskatoon 40HP
- Rig Manager Shack – wheeled trailer w/ crew bathroom
- Loads – Summer 4 & Winter 5
![](https://komatdrilling.com/wp-content/uploads/2018/05/rig3.jpg)
Rig 3 – Self Mobile Atlas Copco RD-20 & Top Drive
- Hook load – 120,000 lbs
- Range 3 casing (13 3/8-inch casing max length 13.5m)
- Depth – 1,000 meters
- Mud Tanks – 3 tanks, 30m3 total capacity
- Triplex Mud Pump – 1.7m3 per minute
- 75KW light plant
- Boiler – Saskatoon 40HP
- Rig Manager Shack – wheeled trailer w/ crew bathroom
- Loads – Summer 5 & Winter 6
![](https://komatdrilling.com/wp-content/uploads/2018/10/komat_drilling_equipment_system_alberta_cement_best_october.jpg)
Rig 4 – Self Mobile Atlas Copco RD-20 & Top Drive
- Hook load – 120,000 lbs
- Range 3 casing (13 3/8-inch casing max length 13.5m)
- Depth – 1,000 meters
- Mud Tanks – 3 tanks, 33m3 total capacity
- Triplex Mud Pump – 2.14m3 per minute
- 105KW light plant
- Boiler – Saskatoon 60HP
- Rig Manager Shack – wheeled trailer w/ crew bathroom
Loads – Summer 7 & Winter 8
Cementer 1 – Trailer Mounted
- 8m3 cement batch mixer
- Digital Density meter and Flowmeter with information storage capability and Bluetooth laptop communication
- Centrifugal pump 1.5m3 per minute
Cementer 2 – Trailer Mounted
- 10m3 cement batch mixer
- Digital Density meter and Flowmeter with information storage capability and Bluetooth laptop communication
- Positive Displacement Progressive Cavity pump 1.3m3per minute
Cementer 4 – Pumping Truck
- 14m3 dual compartment batch mixer
- Digital Density meter and Flowmeter with information storage capability and Bluetooth laptop communication
- SPM Triplex pump capable of 1.5 m3 per minute
4 Cement Bulkers
2 x 30 tonne + 2 x 25 tonne
4 Water Trucks
2 x 16m3 tank + 2 x 20m3 tank
4 Vac Trucks
3 x 12m3 tank + 1 x 15m3 tank
4 Loaders
With pipe grapples, pallet forks and bucket
Contact Us
![](http://komatdrilling.com/wp-content/uploads/2018/05/komat_logo_rev_calgary_western_canada_drill_casing.png)
Corporate Office
Calgary, Alberta Office
Ryan Smith | CFO & Director of Business Development
Wainwright, Alberta Office
Rick Verhoeven - President
Kindersley, Saskatchewan Office
Ryan Smith | CFO & Director of Business Development